Centrotherm Systemtechnik has expanded its site in Brilon with an impressive construction project. The new production hall, the high-bay warehouse, the dispatch area and the modern outdoor facilities – including an electric filling station – set new standards in industrial architecture. This project combines innovative technology, sustainability and aesthetics.

Detailed view of high-bay warehouse

A successfully completed building project

The extension of the existing hall complex was completed in just one construction phase. An ultra-modern production hall was created, which was optimally connected to the existing plant. At the same time, a high-bay warehouse was built, which ensures efficient storage and logistics with a storage height of over 9 meters. The completed facility now covers an additional area of 6,220 square meters and perfectly complements the existing 15,880 square meters of the complex. Particularly noteworthy is the new electric filling station on the site, which sends out a clear signal of Centrotherm’s sustainable orientation.

Detailed view of the production hall

Architectural highlights

 

The pictures of the finished system show how functionality and design harmonize:

  • Outdoor facility and electric filling station: The illuminated outdoor facility underlines Centrotherm’s modern and environmentally conscious orientation. The electric filling station with its futuristic design is not only practical, but also a visual highlight.

The entire complex at night. The charging stations in the foreground.

  • Production hall: With light-flooded rooms, a well thought-out structure and state-of-the-art equipment, the new hall provides a highly productive working environment. The open design and clear lines reflect future-oriented architecture.

View of the production hall

 

  • High-bay warehouse: The heart of the logistics area is the high-bay warehouse with an impressive height of 21 meters. The structure not only optimizes storage capacity, but also sets new standards in terms of efficiency.

View of high-bay warehouse and logistics area

 

  • Technology and safety: the fire protection concept is integrated into the architecture. The red fire protection installations accentuate the modern design and at the same time ensure maximum safety.

Detailed view of fire protection system

 

  • General view of the facility: The final exterior view shows the entire complex, embedded in a spacious green area. The clear design and the integration of modern technologies make the complex a showcase project.

Building complex with high-bay warehouse (back)
and the logistics area (left)

 

A sustainable and innovative concept

The project clearly shows how Centrotherm is geared towards the future. Sustainable building materials, energy-efficient roofs with thermal insulation and the integration of an electric charging station are just some of the measures that minimize the company’s ecological footprint. At the same time, the use of state-of-the-art construction methods has enabled the building to be completed quickly and in a way that conserves resources. Inspiration for industrial architecture With the completion of this construction project, Centrotherm has demonstrated how modern industrial buildings can be designed not only functionally, but also aesthetically and sustainably. Architects and architecture enthusiasts can gain valuable inspiration for their own projects from this project. The new production and storage areas are a further example of how innovative construction projects can help companies to secure their future and at the same time take responsibility for the environment.